Private Networks

As an experienced HV/LV contractor, EAST Solutions provides a range of services to private network owners. This includes the replacement of existing assets, extending current networks through the installation of additional equipment and substations. In addition to this the company undertakes private wires from renewable energy generators to demand users.

These services include:

Design
and Feasibility

Cable
Installation

Substation
Construction
Procurement of equipment
Transformer, Switchgear and Cable
Transformer and
Switchgear Installation
Test and Commissioning
including G99

Cable
Jointing

Trench
Excavation

Production of project completion
file and as built records

Case Studies

Client:

Future Biogas

Project Name: Redstow to Marham Interconnector

Date: March 2018 – January 2019


Brief Description Of The Works:

EAST Solutions were contracted by Future Biogas to connect an Anaerobic Digestor at Redstow Renewables in Swaffham to the RAF base in Marham. This project involved an HV cable being installed between both sites totalling 6.75 km in length. EAST Solutions work scope included verification of the cable route as well as the electrical and civil design. All civil engineering works were carried out by EAST, including excavation of the cable trench, duct laying and cable pull. This also included the fibre optic communication cabling and all associated cable jointing. EAST Solutions installed a new 11kV Genie Evo Switchboard at RAF Marham including the associated protection inclusive of the G59 scheme. At the Redstow Renewables end EAST Solutions supplied and installed a 33kV Circuit Breaker and 33kV Transformer.

Upon successful installation the new system was tested and commissioned and finally energised in January 2019. This landmark installation now means that RAF Marham is the first military base in the UK to receive over 95% of its electricity from renewable sources. The AD plant is fuelled by crops grown locally in the surrounding area. The installation was officially opened by Tobias Ellwood MP on 31st January 2019.

Client TestimonyShahid Jaura, Project Engineer at Future Biogas

“EAST solutions were instrumental in design, installation and commissioning for HV cable project to RAF Marham. Their project team integrated delivery programme seamlessly to minimize any disruption both on Biogas plant and on RAF Marham site operations. I have worked with EAST solutions on various projects and would recommend them to any other business considering HV works.”

Contact EAST today

We will find the right solution for you!

Client:

Thameswey Energy

Project Name: Dukes Court

Date: May 2017 – January 2018


Brief Description Of The Works:

EAST Solutions has been working with Thameswey Energy over the last 18 months on a number of projects in the town of Woking. These commercial developments are part of the Borough Council’s regeneration programme for Woking and will create new commercial and retail property space in the town centre. As part of this work EAST Solutions has constructed and installed a number of private network substations and has an ongoing programme to deliver more substations over the next 12 months.

One recently completed project was the private wire installation within the town centre providing a new 11kV private supply to support the ongoing development. This work included the electrical design comprising the cable sizing, feasibility and planning for the cable route as well as the proposed substation layouts. EAST Solutions then carried out the installation work including the cable pull and jointing as well as the supply of a new Ring Main Unit, Transformer and LV switchboard. Finally all works were commissioned by EAST’s Commissioning Engineers and tested prior to energisation by the EAST Senior Authorised Person.

Contact EAST today

We will find the right solution for you!

Client:

Key Integrated Services

Project Name: Alpro Food Factory – Energy Centre

Date: August 2018


Brief Description Of The Works:

EAST Solutions were contracted by Key Integrated Services to install a new 1500kVA Transformer and 11kV Ring Main Unit as part of an extension to the Alpro Food Factory’s existing private network. The works involved the supply of the new transformer and RMU as well as the HV 11kV and LV cable. The existing cable system was modified and new cable installed onto the pre-prepared containment. EAST supplied the cable jointers as part of the onsite engineering team. In addition an emergency trip button was installed and prior to completion the new installation was tested and commissioned.

This project was challenging due to the sites production operating 24 hours a day and seven days a week. Therefore the works had to be planned in with the client and site to ensure all parties were aware of each stage of the project. EAST communicated with the site and local DNO (WPD) to ensure that the site did not experience any disruption to their power supply which would have resulted in lost production. All works were successfully completed as per the original plan and the new installation was energised on schedule to the satisfaction of both the client and Alpro.